
造成雙組份打膠機(jī)打膠不飽滿的原因有哪些?
時(shí)間:2019-09-10 來(lái)源:http://www.dgjiaxing.com.cn/ 發(fā)布人:昌盛機(jī)械
雙組份打膠機(jī)打膠不飽滿,要怎么解決?其實(shí)我們的雙組份打膠機(jī)出現(xiàn)這個(gè)問(wèn)題,主要是有以下幾種情況導(dǎo)致的:
How to solve the problem of insufficient gluing of two-component gluing machine? In fact, the problem of our two-component glue punch is mainly caused by the following circumstances:
一、打膠速度過(guò)快
1. Gluing speed is too fast
有的客戶為了加快自己的生產(chǎn)節(jié)奏追趕生產(chǎn)計(jì)劃,將打膠速度認(rèn)為調(diào)整的過(guò)快,導(dǎo)致膠體還沒(méi)有完全達(dá)到合格標(biāo)準(zhǔn)機(jī)頭就已經(jīng)移動(dòng)到下一個(gè)位置進(jìn)行打膠操作了。
Some customers in order to speed up their production rhythm to catch up with the production plan, the gluing speed is considered to be too fast to adjust, resulting in the colloid has not fully met the qualified standard head has moved to the next position for gluing operation.
如果我們需要加快打膠的速度調(diào)整了打膠機(jī)的移動(dòng)參數(shù)的話,那么我們對(duì)應(yīng)的也應(yīng)該對(duì)供膠系統(tǒng)也進(jìn)行相應(yīng)的設(shè)置,比如這時(shí)候我們就需要加大供膠壓力,增大打膠機(jī)的出膠速度來(lái)配合對(duì)象的移動(dòng)速度的增加。
If we need to speed up the gluing speed and adjust the moving parameters of the gluing machine, then we should also set up the gluing system accordingly. For example, at this time, we need to increase the pressure of the gluing machine, increase the speed of the gluing machine to match the increase of the moving speed of the object.
如果我們僅僅是單獨(dú)的增加了打膠機(jī)的移動(dòng)速度而沒(méi)有對(duì)壓力進(jìn)行調(diào)節(jié)的話就很有可能出現(xiàn)打膠不飽滿的情況發(fā)生。
If we simply increase the speed of the glue machine without adjusting the pressure, it is likely that the glue will not be full.
二、供膠壓力不足
2. Insufficient supply pressure
這個(gè)情況其實(shí)在前一種情況的已經(jīng)進(jìn)行過(guò)描述了,即便你沒(méi)有對(duì)打膠機(jī)的移動(dòng)速度進(jìn)行調(diào)節(jié)也出現(xiàn)了打膠不飽滿的情況,那么也有可能是供膠壓力過(guò)小導(dǎo)致的。這時(shí)候我們僅僅需要調(diào)整供膠壓力即可完美的解決這個(gè)問(wèn)題的發(fā)生。
In fact, this situation has been described in the former case. Even if you do not adjust the speed of the glue machine, there is a situation that the glue is not full, then it may also be caused by too little glue supply pressure. At this time, we only need to adjust the supply pressure to solve this problem perfectly.
三、機(jī)頭感應(yīng)器損壞
3. Damage of nose inductor
這種情況非常的少見,但是也不排除這種情況的發(fā)生。在我們的打膠機(jī)機(jī)頭有一個(gè)對(duì)鋁條深淺進(jìn)行探測(cè)的感應(yīng)器,如果發(fā)現(xiàn)雙組份鋁隔條過(guò)深或者過(guò)淺的時(shí)候他會(huì)自動(dòng)的調(diào)整移動(dòng)的移動(dòng)速度以及供膠壓力(自動(dòng)調(diào)整幅度是小范圍內(nèi)的)。如果我們的鋁條本身就深淺不一,在加上我們的感應(yīng)器損壞的壞就會(huì)發(fā)生這種情況!
This situation is very rare, but it can not be ruled out. There is a sensor to detect the depth of aluminium bar in the head of our gluing machine. If it is found that the two-component aluminium bar is too deep or too shallow, it will automatically adjust the moving speed and the gluing pressure (the automatic adjustment range is small). If our aluminium bars are different in depth, this will happen if our sensors are damaged.
好了,今天的精彩內(nèi)容就先給大家介紹到這里了,歡迎大家收藏我們的網(wǎng)站:http://linshi.jncsjx.com,我們將會(huì)定期更新更多的精彩內(nèi)容!大家搜索關(guān)鍵詞:雙組份打膠機(jī),這樣也可以找到我們!謝謝大家的支持!
Well, today's wonderful content is introduced to you first, welcome to collect our website: http://linshi.jncsjx.com, we will update more wonderful content regularly! Everyone searches for keywords: two-component glue machine, so you can find us! Thank you for your support!造成雙組份打膠機(jī)打膠不飽滿的原因有哪些?
- 全自動(dòng)鋁條折彎?rùn)C(jī)長(zhǎng)期使用中典型出現(xiàn)的問(wèn)題是什么,怎么解決? 2025/06/07
- 中空玻璃加工設(shè)備:立式與臥式清洗機(jī)的差異化解析 2025/06/06
- 雙組份打膠機(jī)切換膠水清潔全流程解析 2025/06/05
- 全自動(dòng)封膠線輔助傳送前限位是什么意思? 2025/06/04
- 雙組份打膠機(jī)是為解決什么問(wèn)題產(chǎn)生的呢? 2025/06/03
- 全自動(dòng)丁基膠涂布機(jī)操作注意事項(xiàng):細(xì)節(jié)決定品質(zhì)與效率 2025/05/27
- 雙組份打膠機(jī):解碼膠水混合后的固化時(shí)間控制藝術(shù) 2025/05/26
- 臥式丁基膠涂布機(jī)傳動(dòng)系統(tǒng)維護(hù)要點(diǎn)解析 2025/05/20
- 中空玻璃加工必備8大設(shè)備詳解 2025/05/19
- 全自動(dòng)鋁條折彎?rùn)C(jī)在工作中有什么優(yōu)勢(shì)? 2025/05/16
產(chǎn)品分類Product categories
聯(lián)系我們Contact us
- 咨詢熱線:0531-85717458 13705446998
- 公司地址: 山東省德州市齊河安頭鄉(xiāng)企巢工業(yè)園
- 掃碼聯(lián)系我們: