免费又黄又爽A片免费看图片,日韩第一页色,DN男人的天堂网,日韩无码成人网

丁基膠涂布機(jī)自動(dòng)涂膠基本過程

時(shí)間:2022-10-12 來源:http://www.dgjiaxing.com.cn/ 發(fā)布人:昌盛機(jī)械

自動(dòng)涂膠基本過程
Basic process of automatic gluing
1.測(cè)寬:一次使用或鋁框?qū)挾雀淖兒?,需要?duì)鋁條進(jìn)行測(cè)寬,以便傳送時(shí)鋁框順利通過膠嘴。
1. Width measurement: after one use or the width of the aluminum frame is changed, it is necessary to measure the width of the aluminum strip so that the aluminum frame can pass through the rubber nozzle smoothly during transmission.
2.加熱:進(jìn)入自動(dòng)狀態(tài)后,膠嘴和膠盤要行加熱,同時(shí)傳送帶轉(zhuǎn)動(dòng),以免膠嘴溫度升高后將傳送帶燙壞,溫度高于80度以后打膠流程才會(huì)起效。
2. Heating: after entering the automatic state, the rubber nozzle and the rubber disk shall be heated first, and the conveyor belt shall be rotated at the same time to avoid burning the conveyor belt after the temperature of the rubber nozzle rises. The gluing process will not take effect until the temperature is higher than 80 ℃.
3.傳送打膠:當(dāng)達(dá)到設(shè)定溫度后,手持鋁框放在傳送帶上,當(dāng)前端打膠光電檢測(cè)到鋁框時(shí),自動(dòng)涂膠過程開始。打膠光電有信號(hào)后,延時(shí)一段時(shí)間,前壓輪下壓,壓住鋁框;前壓輪下壓后延時(shí)一段時(shí)間,膠缸前進(jìn),膠嘴出膠。開始涂膠后,再延時(shí)一段時(shí)間,后壓輪下壓。打膠光電信號(hào)消失后,延時(shí)一段時(shí)間,前壓輪抬起,前壓輪抬起后,再延時(shí)一段時(shí)間,膠缸停止前進(jìn),同時(shí)膠嘴停止涂膠;停止涂膠后,再延時(shí)一段時(shí)間后,后壓輪抬起,鋁框一邊涂膠完成。
3. Transfer gluing: when the set temperature is reached, put the aluminum frame on the conveyor belt by hand. When the front end gluing photoelectric detects the aluminum frame, the automatic gluing process starts. After there is a signal from the gluing photoelectricity, delay for a period of time, and press down the front pressing wheel to press the aluminum frame; After the front pressure roller is pressed down, the rubber cylinder will advance and the rubber nozzle will release rubber. After the start of gluing, delay for a period of time and press down the rear pressure roller. After the photo electric signal of gluing disappears, delay for a period of time, the front pressure wheel is lifted, and after the front pressure wheel is lifted, delay for a period of time, the glue cylinder stops moving and the glue nozzle stops gluing; After stopping the gluing, after a period of time, the rear pressure roller will be lifted and the gluing on one side of the aluminum frame will be completed.
之后重復(fù)傳送打膠流程,將鋁框剩余三邊全部涂上丁基膠,鋁框涂膠就全部完成。
After that, repeat the transfer and gluing process, coat the remaining three sides of the aluminum frame with butyl glue, and the gluing of the aluminum frame is completed.
因?yàn)榇蠖鄶?shù)鋁框?yàn)榉叫味贁?shù)為圓形,所以在自動(dòng)中可以進(jìn)行方形和圓形的切換。當(dāng)為圓形框涂膠時(shí),中間壓輪壓住圓框,同時(shí)皮帶轉(zhuǎn)動(dòng),膠嘴出膠,松開腳踏開關(guān)該過程停止。
Since most of the aluminum frames are square and a few are round, you can switch between square and round in automatic. When the round frame is coated with glue, the intermediate pressure roller presses the round frame, and the belt rotates, the glue nozzle is released, and the process stops when the foot switch is released.
以上就是為大家介紹的有關(guān)丁基膠涂布機(jī)的詳細(xì)的介紹,希望對(duì)您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)
The above is the detailed introduction of butyl rubber coater for you. I hope it will help you. If you have any questions, please contact us. We will provide you with services with a 

聯(lián)系我們Contact us

  • 咨詢熱線:0531-85717458 13705446998
  • 公司地址: 山東省德州市齊河安頭鄉(xiāng)企巢工業(yè)園
  • 掃碼聯(lián)系我們:

截屏,微信識(shí)別二維碼

微信號(hào):13705446998

// 午夜久久福利| 99国产精品成人观看| 人妻av无码中文专区久久| 亚洲AV无码日韩一区二区乱| 成人社区一区二区久久精品| 欧美日韩一区中文在线| 伊人大久久久久久| 在线人妻少妇一区二三区| 国产欧美日韩综合精品无毒| 国产精品久久久久久成人影院| 中文字幕人妻视频在线 | 午夜乱伦| 丁香七月激情视频| 久久蜜臀热播视频| 国产精品 涩爱| cao.pro| 日日添夜夜添夜夜添欧美| 2018亚洲日韩在线观看视频 | 男人天AV| 久久永久免费中文字幕| SM麻豆国产网站| 午夜福利一区| 国产精品情侣宾馆自拍| 亚洲成人精品网址| 天传媒| 久久AV无限观看| 四虎影园www| 国产黄色三级片视频在线观看| 日韩国产欧美| 亚洲无码av噜噜| 黑人日亚洲美女| 国产午夜精品人| 欧美A级超大胆视频| 亚洲成a人一区二区三区| 国产无码 中文字幕| 男人女人动态图| 草草看| 久久精品99久久香蕉国产色戒| 欧美日韩亚洲综合一区| 99精品免费观看| 亚洲WWW在线视频|